8.08.2009

The bonding of PE pipe requires Tyco's special machine.

Wawan and Putres align two pipes for the heating process. Pipes must be cut properly, placed in the brace straight, plates heated, placed, and clamped together. This machine along with a generator was carried up and down the mountainside. Technical difficulties stopped the process often but finally after three days and much work the lines were connected. (Men stayed on-site over night to prevent vandalism.)

No comments:

Come See Indonesia From Our Eyes

Another year- 2010. Great adventures await. Family is great. And soon this year will be over too.